EuropeC&I2025
Rooftop Storage Retrofit
- Location
- Rotterdam, Netherlands
- Installed Capacity
- 480 kWh / 260 kWp
- Application
- C&I

Project background
A cold-storage logistics operator faced rising peak tariffs and a roof array installed two years earlier that exported most of its midday generation.
Solution adopted
Grid-tied Solar SystemTwo liquid-cooled cabinets were added behind the existing inverter group, with dispatch configured to absorb PV surplus and cap site demand during the 08:00–20:00 window.
- Storage absorbed surplus PV instead of exporting it
- Demand ceiling configured per quarter-hour interval
- Commissioning completed without interrupting cold-chain load
Site photos