S01
Grid-tied Solar System
The baseline system for sites with a stable grid: PV arrays feed daytime loads first and export the remainder under the local net-metering or PPA arrangement.

Where this fits
Factory roof with daytime load
Generation profile overlaps with production hours, keeping self-consumption high.
Warehouse with low night load
No storage needed when evening demand is minimal.
System composition
Each block below is quoted as a line item so the scope is visible.
PV modules
Roof or ground array, sized to available area
String inverter
MPPT tracking per roof orientation
Combiner & cabling
DC protection, surge arresters, UV cable
Monitoring
String-level data to operator dashboard
Why this configuration
Lowest cost per kWh
No battery investment; payback depends mainly on self-consumption ratio.
Simple maintenance
Cleaning and connector inspection are the main routine tasks.
Expandable to storage
Hybrid-ready inverters allow later battery addition without replacing the array.
System Topology
Illustrative arrangement. Protection, earthing and metering are specified per project after the site survey.
Reference project
Project references can be discussed in more detail under NDA, including sizing sheets and commissioning records.