S05
Solar Carport Solution
Structure, PV roofing, inverters and optional chargers delivered as one package for office, retail and fleet parking.

Where this fits
Office campus
Shaded parking with generation matched to building load.
Retail car park
Customer shade plus visible sustainability commitment.
System composition
Each block below is quoted as a line item so the scope is visible.
Steel structure
Galvanised columns and purlins
PV roofing
Framed modules or metal sheet
Inverters
String inverters at column bases
Charger provision
Ducting and mounting points
Why this configuration
Dual use of land
Parking keeps its function while generating electricity.
Vehicle protection
Hail and direct sun exposure reduced for parked vehicles.
Charger-ready
Conduits installed at construction stage avoid later excavation.
System Topology
Illustrative arrangement. Protection, earthing and metering are specified per project after the site survey.
Reference project
Project references can be discussed in more detail under NDA, including sizing sheets and commissioning records.
Talk To Our EngineerSolar Carport Solution
Request a topology and bill of materials for your site.
